Shaping our Community.

CA-HSR-train.jpg

California High Speed Rail

Arrow-white.png
CA-HSR-Train-HR.jpg

PROJECT DETAILS

The California High-Speed Rail will enable travel from LA to SF at speeds up to 220mph

  • Supporting Authority's Engineering Services Branch since 2019

  • Driving active construction to the highest levels in the program’s history

  • Incorporating lessons from past and current projects into the Authority's future

SERVICES PROVIDED

  • Program Management

  • Engineering Oversight

  • Design Review

  • Utility Stakeholder Coordination

California High Speed Rail
Projects Page Picture.jpg

Link 21

Arrow-white.png

PROJECT DETAILS

Link21 is a transportation program sponsored by the San Francisco Bay Area Rapid Transit District (BART) and the Capitol Corridor Joint Powers Authority (CCJPA). The goal is to transform the passenger rail network serving the 21-county Northern California Megaregion (Megaregion)

SERVICES PROVIDED

VST Engineering is responsible for the flagship conceptual rail alignment design for the Transbay Crossing, West San Francisco extension and the I-980 Rail Corridor Concept Study. These Corridors shall serve as the building blocks for development of the Program Concepts and will require large investments in underground infrastructure to serve desired markets while minimizing negative impacts to affected communities.

Link 21

SUCCESS STORY

VST Engineering joined the Rail Delivery Partner Team in 2019, while the contract was well underway. VST was able to quickly integrate within the Authority Team by immersing themselves in the current Construction Packages and identifying key issues hindering construction progress. By understanding the needs of the program’s stakeholders, VST has helped drive active construction to the highest levels in the program’s history. By supporting a major infrastructure program with over $2.7 billion of executed on-going construction contracts, VST Engineering understands that accurate and timely responses are critical to project success.

Walking into Fresno Trench_.JPG
Quotes-open.png

VST has been a client on California High Speed Rail for 3 ½ years. The company has proven to be invaluable to our program. They bring a broad range of expertise and experience that makes the company a very unique contributor to our team. They have been instrumental in a wide range of areas that have contributed to the success of our Engineering Services Branch including: civil engineering related expertise: roadway, hydrology, track and guideway and structures; construction support services: comment resolution, construction related issues, including utilities and general representation of Engineering at the construction level. This company went above and beyond for the Authority, stepping up and delivering whenever we asked. I would not hesitate to hire VST to perform these services in the future and without reservation would recommend VST as a consultant.”

Brian Sutliff, S.E.

Director of Engineering

High Speed Rail Authority

Quotes-close.png
34867578575.jpg

LA Metro

Arrow-white.png

PROJECT

Los Angeles County Metropolitan Transportation Authority (Metro) – Inspection of Structures (2021-present)

PROJECT DETAILS

Metro has several hundred structures, including vehicular bridges, pedestrian bridges, rail bridges, retaining walls, tunnels, stations, culverts, and other structures carrying the Metro Line or within the Right of way.

SERVICES PROVIDED

VST Engineering is responsible for the review of inspection reports, provide concurrence or technical commentary on observations and proposed recommendations, participate in round table discussions, and provide a stamp and signature for each report.

PROJECT

Traction Power Program. Oakland, CA. 

PROJECT DETAILS

Bay Area Rapid Transit (BART) is currently replacing critical Traction Power infrastructure throughout the system. This new infrastructure is vital to improving the customer experience by increasing service reliability. 

SERVICES PROVIDED

VST Engineering serves as Project Manager for seven projects totaling $487.5M ranging from project planning to construction.  VST is responsible for managing project schedules and budgets. VST Engineering is also responsible for coordinating among affected BART stakeholders for both contracted projects and projects being performed by in-house forces.